Lancelin Wind Farm

Infrastructure
  • Client: Blair Fox
  • Project Timeframe: May 2012 – Aug 2012
  • Location: Lancelin WA
  • Contract Value: $3.5 million

Engineering Design

Projects

Procurement

Construction

Power

Scope of Works

Supply, installation, testing, commissioning and certification of high voltage distribution for two wind farms in the Lancelin area.

  • Supply, dressing and installation of 112 wood poles
  • Installation of reclosers and pole top transformers
  • Installation of ground mount substations
  • Supply, installation and commissiong of 6000m of 33kV cable
  • Termination of the high voltage cables and earthing to each wind turbine transformer 
  • Installation of Metering Transformer for anti-islanding protection and renewable energy credit metering