Lancelin Wind Farm
Infrastructure
- Client: Blair Fox
- Project Timeframe: May 2012 – Aug 2012
- Location: Lancelin WA
- Contract Value: $3.5 million
Scope of Works
Supply, installation, testing, commissioning and certification of high voltage distribution for two wind farms in the Lancelin area.
- Supply, dressing and installation of 112 wood poles
- Installation of reclosers and pole top transformers
- Installation of ground mount substations
- Supply, installation and commissiong of 6000m of 33kV cable
- Termination of the high voltage cables and earthing to each wind turbine transformer
- Installation of Metering Transformer for anti-islanding protection and renewable energy credit metering