Projects

ATCO Gas Reinstating

ATCO Gas Reinstating

  • Client: ATCO Gas
  • Project Timeframe: Dec 2012 - ongoing
  • Location: Perth Metropolitan Area
  • Contract Value: $1.3 million per annum

ATCO Gas has engaged Contraflow on an ongoing basis to supply reinstatement services relating to their service works within the Perth Metropolitan Area.

North Ridge Borefield

North Ridge Borefield

  • Client: Rio Tinto Iron Ore
  • Project Timeframe: Apr 2011 – Aug 2011
  • Location: Yandi, Newman WA
  • Contract Value: $1 million

Installation, construction, testing and commissioning of the Ridge North Bore field project

7 Mile Rail Facility Network Connection

7 Mile Rail Facility Network Connection

  • Client: Rio Tinto Iron Ore
  • Project Timeframe: Dec 2010 – Oct 2011
  • Location: 7 Mile, Karratha WA
  • Contract Value: $4 million

Design, supply and install 5km of 33kV overhead line at the 7 Mile Rail Facility Network

Cloudbreak Power Network

Cloudbreak Power Network

  • Client: Fortescue Metals Group
  • Project Timeframe: Aug 2010 – Jul 2011
  • Location: Cloudbreak, Chichester WA
  • Contract Value: $6.5 million

Electrical expansion works including power station relocation, village expansion and substation works and maintenance.

Garden Wells Gold Mine

Garden Wells Gold Mine

  • Client: Regis Resources
  • Project Timeframe: Oct 2012 - April 2013
  • Location: Laverton, WA
  • Contract Value: $3 million

Engineering, design, supply, installation, testing, commissioning and certification of 11kV high voltage distribution line for Garden Wells Gold Mine, owned and operated by Regis Resources.